Technical desk

Contact Owens Corning Specification Specialists

Reach application engineers for R-value packages, Duration shingle wind ratings, and Preferred Contractor referrals. Include climate zone, target thermal resistance, roof slope, and whether you need Class 4 impact documentation so we can route your note to the correct product desk within one business day.

Procurement managers and specification writers typically ask for published thermal conductivity context, fire resistance rating pathways, moisture vapor transmission notes at kraft facings, and dimensional stability limits for foam board continuous insulation. Share those constraints up front—along with VOC emissions targets for GREENGUARD Gold packages—so we do not bounce your inquiry between roofing and insulation desks.

Headquarters address

Owens Corning World Headquarters
One Owens Corning Parkway
Toledo, OH 43659, USA

Business hours

Monday–Friday
08:00–17:30 Eastern Time
Jobsite support line for active roofing & insulation installs

Map illustration of Owens Corning technical campus in Toledo

Visit / ship samples

Ship substrate coupons, shingle samples, or foam board cores for thermal and wind screening to the Toledo technical center receiving dock. Label packages with project name, target R-value or wind rating, climate zone, and whether ENERGY STAR or GREENGUARD Gold thresholds apply. Coupons must be large enough for thermal resistance specimens; roof deck samples should note existing underlayment when overlays are planned. Note Buy America or domestic-mill constraints so logistics quotes lead time in calendar days rather than catalog optimism.

Attic loosefill trials: include joist depth, ventilation net free area, and air permeability concerns at bypasses. Continuous insulation teams: mark rim-board transitions, sheathing type, and water absorption rate expectations for below-grade XPS. Panel builders: state whether insulation is factory-installed or site-packed—compression and dimensional stability checks differ. If the project needs recycled content percentage notes for a green checklist, say so; otherwise we route code-compliant standard assemblies that still clear inspector lists without inflating the material budget.

  • LinkedIn: Owens Corning Building Materials
  • YouTube: Installation technique libraries
  • Sample dock hours: Mon–Thu 08:00–16:00 ET

Send a technical inquiry

Use this full contact form for data packages—not the compact modal used on product cards. Include jurisdiction, assembly type, and whether you need comparative R-value tables, wind warranty outlines, or Preferred Contractor referrals for faster routing.