Owens Corning Logo
  • Home
  • Products
  • Services
  • Industries
  • Resources
  • Contact Us
Request Technical Specs

Terms of Service

These terms govern use of the Owens Corning information website at owenscorningbuildingus.com and related inquiry forms. By accessing this site you agree to the conditions below. If you do not agree, discontinue use of the site.

Information purpose

Content on this site—including product descriptions, R-value examples, wind uplift references, and installation summaries—is provided for general specification guidance. It does not replace project-specific engineering, local building-code interpretation, or stamped drawings. Always verify the latest technical data sheet and listed assembly before procurement or installation.

Inquiries and quotes

Submitting an inquiry through our forms does not create a binding contract. Pricing, lead times, and warranty eligibility depend on product availability, Preferred Contractor status, and project conditions confirmed in writing by an authorized Owens Corning representative or distributor.

Intellectual property

Trademarks, logos, text, and downloadable documents remain the property of Owens Corning or its licensors. You may not reproduce technical libraries for commercial redistribution without written permission.

Limitation of liability

To the fullest extent permitted by law, Owens Corning is not liable for indirect, incidental, or consequential damages arising from use of this website or reliance on published examples that differ from the applicable product data sheet for your project.

Contact

Questions about these terms: [email protected] or via the contact page.

Products
Architectural Shingles Duration Shingles Fiberglass Insulation Foam Board Insulation
Resources
Technical Resources Specification Services Industries Blog
Company

Owens Corning

Think Pink. Build Better. — roofing and insulation systems engineered for North American envelopes since 1938.

About Us Contact Us Terms of Service Privacy Policy
© 2026 Owens Corning. All rights reserved. Terms · Privacy

Request Technical Specs

Share product family, R-value or impact targets, and project volume.